Over the past couple of years, we’ve had some sink holes develop on our driveway and down the side of the hill near the driveway. Last fall, we had that section of the driveway repaved, but still needed to fix the side of the hill.
On Friday, Jeff ordered 25 tons of dirt! It sounded like a lot of dirt, but I had no idea how much dirt 25 tons really is until it was all piled up in the driveway, waiting for us to shovel it down the hill.
Here’s Carter watching the truck dump it out:
That is A LOT of dirt! The pile was taller than me!!
At least we have 2 good helpers to move some of it.
The Good News: Jeff and I were able to get almost all of the pile spread out and the holes filled.
The Bad News: Jeff ordered 6 yards of loam to put on top of the dirt fill to spread this week.
No comments:
Post a Comment